A comprehensive homeowner's guide to researching property conditions, zoning, utilities, agency requirements, permits, fees, and project considerations before building an accessory dwelling unit in Sacramento City, Sacramento County, and surrounding jurisdictions.
An accessory dwelling unit (ADU) can provide additional living space for family members, create a separate residence, or offer a potential rental opportunity. But before choosing a floor plan, comparing construction costs, or hiring someone to prepare drawings, there are important questions to investigate about the property itself.
Two properties in the same neighborhood can have very different development requirements. One may have a straightforward permitting process, while another may involve easements, utility conflicts, drainage improvements, fire access requirements, protected trees, historic review, or unresolved permit records.
The most useful first step is to understand the property—not simply the ADU design.
This guide is intended to help homeowners identify what to research, where to find public information, and which questions to ask before committing to an ADU project. It covers Sacramento City, unincorporated Sacramento County, and surrounding jurisdictions, including Folsom, Rancho Cordova, Roseville, Rocklin, Citrus Heights, Davis, Placer County, and Elk Grove.
The information and links below are starting points. Not every requirement applies to every property, and an online resource cannot replace confirmation from the agency responsible for the parcel.
PART 1: START WITH THE PROPERTY
1. Confirm Which Agency Has Jurisdiction
Before researching ADU requirements, determine which local agency has authority over the property.
A property's mailing address does not necessarily identify its permitting jurisdiction. For example, a Sacramento mailing address does not automatically mean the property is within the City of Sacramento. Some properties with Sacramento addresses are located in unincorporated Sacramento County or another incorporated city.
This distinction matters because zoning standards, building permit applications, plan-review procedures, inspection requirements, fees, and local ordinances can differ between jurisdictions.
A property may also require review from multiple agencies. The local building department is not necessarily the only authority involved.
Official Jurisdiction Starting Points
The following directory provides a starting point for researching the ten jurisdictions covered in this guide. Each entry includes links to ADU information, planning and zoning, building services, permit portals, mapping resources, and applicable codes or forms where available.
Important: Some agencies combine planning, zoning, building, and permitting services on one website or portal. Where a separate public portal or dedicated ADU page is not readily available, the directory links to the responsible department or official resource page. Contact the agency to confirm the current application route and applicable forms.
1. City of Sacramento
For properties within Sacramento City limits.
ADU Resources: The City's ADU Resource Center provides guidance on planning, designing, submitting, building, and operating an ADU. It also includes shelf-ready plan information and project resources.
Zoning / Planning Services: The Planning Division provides zoning, development standards, planning applications, and related information. Review the Planning and Zoning FAQ and Sacramento City Code.
Building Services: The Building Division and Permit Services provide building permit information, submittal requirements, plan review, fee estimates, and inspection resources. The City's Building Forms and Applications include ADU-related forms and checklists.
Public Permit Portal: Use the City's Public Permit Portal for applicable permit applications and records. The Electronic Plan Check resources explain electronic plan submissions.
GIS / Mapping: The City's AgencyCounter provides a map-based way to research planning applications and building permit activity. For parcel and zoning information, use the City's zoning designation lookup.
Building Permits and Inspections: Begin with Building Permit Services for permit status, application instructions, inspection scheduling, and building records.
Useful additional resource: The City has a preapproved ADU plan program. A preapproved plan does not eliminate the need for property-specific site, zoning, and building permit approval.
2. Unincorporated Sacramento County
For properties outside incorporated city boundaries that fall under Sacramento County jurisdiction.
ADU Resources: Start with the County's Planning and Environmental Review resources and ADU and residential accessory-use guidance. Sacramento County also offers shelf-ready ADU plans for qualifying properties in unincorporated areas.
Zoning / Planning Services: The Planning and Environmental Review Division provides zoning and land-use information. Review the Sacramento County Zoning Code and applicable General Plan and special planning area documents.
Building Services: The Building Permits and Inspection Division provides building applications, forms, plan-review information, and inspection services. Its Building Forms and Documents section includes owner-builder and agent authorization forms.
Public Permit Portal: The County uses Accela Citizen Access for online applications, document uploads, permit records, status checks, and other services.
GIS / Mapping: Use the Sacramento County Online Map Viewer to research parcel information, zoning, jurisdiction, and other property layers. The Planning Projects Viewer provides information about planning applications in unincorporated County areas.
Building Permits and Inspections: The Building Permits and Inspection Division explains applications, permit records, and inspection procedures. See the separate inspection scheduling instructions.
Important jurisdiction check: Sacramento County's Planning FAQ specifically instructs property owners to check the jurisdiction field in the County map viewer. If it does not identify the property as being in the unincorporated area, contact the applicable city instead.
3. City of Folsom
For properties within Folsom City limits.
ADU Resources: The City's Accessory Dwelling Units resource page provides ADU guidance, zoning information, and plan preparation instructions.
Zoning / Planning Services: Start with Community Development and its Planning Division. The City of Folsom Municipal Code provides the City's ordinances and development regulations.
Building Services: The Building Services Division provides building permit and inspection information, forms, and submittal requirements.
Public Permit Portal: Use the City's ePermit Center to submit applicable applications and track permit activity. The ADU resource page explains how to select the ADU permit type.
GIS / Mapping: Start with the City's Maps and GIS resources for available mapping tools. Contact Planning if you need confirmation of a parcel's zoning or applicable overlays.
Building Permits and Inspections: The Building Services page and ePermit Center provide the appropriate starting points for permit applications and inspection-related services.
4. City of Rancho Cordova
For properties within Rancho Cordova City limits.
ADU Resources: Begin with the City's Community Development Department and contact Planning for current ADU standards and application requirements. The city also provides an ADU permit application handout on typical requirements.
Zoning / Planning Services: Use the City's Check Zoning resource to locate the zoning district and applicable Zoning Code. The City notes that its former Rancho Cordova Zoning Portal is no longer in use. Contact the Planning Division to confirm property-specific requirements.
Building Services: The Building and Safety Division provides permit and inspection information, application procedures, and contact details.
Public Permit Portal: Use Rancho Cordova Online through the City's Building and Safety page. The City's permit FAQ explains online applications, document uploads, permit status, payments, and inspection scheduling.
GIS / Mapping: Begin with the City's zoning map and available mapping resources. Confirm any parcel-specific zoning or overlay information with Planning.
Building Permits and Inspections: Use the Building and Safety Division for permit requirements and the online portal for applications and inspection scheduling.
Additional consideration: Rancho Cordova identifies outside agency permits and reviews that may be needed for projects, including Sacramento County departments, fire, environmental management, sewer, and drainage or water supply agencies. Review the City's resident permit information when determining which other agencies may be involved.
5. City of Roseville
For properties within Roseville City limits.
ADU Resources: Review the City's ADU requirements handout and ADU submittal requirements. Confirm that the documents remain current before relying on specific standards.
Zoning / Planning Services: The Development Services Department provides planning and zoning information. Review the Roseville Municipal Code, including the City's ADU provisions.
Building Services: The Building Division provides building permit applications, plan review, forms, and inspection information.
Public Permit Portal: Start at the City's Permit Center and Development Services resources. Use the City's current online permitting system for applications, permit records, and inspection services.
GIS / Mapping: Use the City's Property Information Tool and Open Roseville data portal to research available property, zoning, land-use, and planning information.
Building Permits and Inspections: Start with the Building Division and its permit and inspection resources.
Planning reminder: Roseville's ADU submittal guidance identifies items such as electrical load worksheets, waterline and drainage calculations, site plans, construction details, energy documents, and other supporting information. Do not assume every item applies to every project; use the current submittal checklist and confirm the required documents with the City.
6. City of Rocklin
For properties within Rocklin City limits.
ADU Resources: The City's Planning Services page includes an Accessory Dwellings section and links to relevant ADU information.
Zoning / Planning Services: Contact Planning Services for zoning, development standards, and planning applications. Review the Rocklin Municipal Code for applicable local regulations.
Building Services: The Building Services Division provides plan review, inspection, permit, and building records information.
Public Permit Portal: The City's Permit Center provides access to eTRAKiT, which supports Building, Planning, Fire, and Public Works permit information and services.
GIS / Mapping: Use Maps and GIS to access City mapping resources, planning project maps, and regional data.
Building Permits and Inspections: The Permit Center is the primary starting point for permits. Review Building Inspection Scheduling for inspection procedures and current requirements.
7. City of Citrus Heights
For properties within Citrus Heights City limits.
ADU Resources: Begin with the City's Planning Division and ADU Central and request current ADU guidance, zoning standards, and application requirements.
Zoning / Planning Services: Review the City's Zoning Code, zoning map, and zoning information request process. Contact Planning before relying on a map or assuming a proposed location is eligible.
Building Services: The Building and Safety Division provides building permit and inspection information, application instructions, and contact details.
Public Permit Portal: The City uses its Building Permit and Inspections Customer Portal for online applications, document uploads, permit status, and inspection scheduling.
GIS / Mapping: Start with the City's Zoning Map and zoning information page. Contact Planning for any parcel-specific map interpretation or additional mapping information.
Building Permits and Inspections: Use the Building and Safety Division for building permit requirements and the customer portal for inspection requests.
Important: Citrus Heights states that its online portal allows users to access projects associated with their accounts. If you are researching historical permits or records for a property you do not own, contact the City about public records access.
8. City of Davis
For properties within Davis City limits, in Yolo County.
ADU Resources: The City's Accessory Dwelling Units and Guest Houses page provides ADU categories, requirements, and information about pre-designed ADU plans.
Zoning / Planning Services: Start with Community Development and Sustainability and the Planning Division. Review the Davis Municipal Code for applicable local ordinances and development standards.
Building Services: The City's Building Division information provides building permit and inspection resources. For direct assistance, see the Community Development staff directory.
Public Permit Portal: Start with the City's online permitting and application information. For current access and application instructions, contact onlinepermits@cityofdavis.org.
GIS / Mapping: Use the City's Maps and GIS resources for available mapping information. Confirm parcel zoning and planning designations with Planning staff.
Building Permits and Inspections: Review the Building Division contact information. The City lists 530-757-5610 for general building information and 530-757-5658 for building inspections.
Planning reminder: Davis identifies different ADU approval categories, including certain state-exempt ADUs, ministerial ADUs, and non-ministerial ADUs. The applicable category can change which planning review is required. Read the current ADU handout and City guidance before preparing an application.
9. Placer County
For properties under Placer County jurisdiction, generally outside incorporated cities.
ADU Resources: Start with the Accessory Homes tab of the Community Development Resource Agency. The Placer County ADU Team can assist with inquires and information via email at ADU@placer.ca.gov
Zoning / Planning Services: The Planning Services Division provides land-use and zoning information. Review the County's Planning Zone Ordinance and related documents.
Building Services: The Building Services Division provides building permit processing, plan review, fees, forms, and inspection information.
Public Permit Portal: Use the Placer County Accela Citizen Access Portal to research permits, submit applicable applications, and access permit information.
GIS / Mapping: The County's GIS and Online Maps page includes parcel, zoning, and land-use mapping tools. Its e-Services page also links to GIS and zoning research.
Building Permits and Inspections: Start with Building Permit Processing, Fees and Reports and e-Services for current permit and inspection options.
Important: Placer County's permit portal and zoning resources are not substitutes for a city's permitting process. Confirm whether the property is in unincorporated Placer County or within an incorporated city such as Roseville or Rocklin.
10. City of Elk Grove
For properties within Elk Grove City limits.
ADU Resources: The City's Accessory Dwelling Units resource page provides ADU guidance, common questions, and outside agency considerations. Review the City's preapproved ADU plans and submittal requirements.
Zoning / Planning Services: Start with Community Development and the City's planning resources. Review the Elk Grove Municipal Code for local zoning and development regulations.
Building Services: The Building Safety and Inspection Division provides building permit information, forms, plan review, and inspection resources.
Public Permit Portal: Use the City's eTRAKiT Permit Portal for applicable permit applications, permit searches, payments, and inspection scheduling.
GIS / Mapping: The City's GIS and Maps page provides interactive maps and property-related information. Its building permit lookup map can help research issued permits.
Building Permits and Inspections: Start with Plan Review and Permits and the Building Safety and Inspection Division.
Important: Elk Grove's ADU guidance identifies outside agencies that may need to provide separate approvals, including the Cosumnes Community Services District Fire Department, Sacramento County Environmental Management for properties with wells or septic systems, school districts, and County utility or infrastructure agencies. Review the City's ADU submittal checklist and contact each applicable agency directly.
2. Understand the Limits of Online Maps and Permit Records
Online mapping tools are useful for preliminary research, but they should not be treated as final legal or technical determinations.
A GIS map may display zoning, parcel boundaries, aerial imagery, flood information, utility layers, or jurisdiction boundaries. However, the information may be generalized, incomplete, outdated, or unsuitable for determining exact property lines or construction locations.
Before relying on map information:
Confirm the parcel's APN and street address.
Verify the permitting jurisdiction with the responsible agency.
Confirm zoning and overlay designations with Planning.
Obtain recorded documents when easements or restrictions are involved.
Consult a licensed surveyor when exact property boundaries matter.
Contact utility providers to verify actual service locations and capacity.
Ask the agency whether a separate written determination or report is required.
Permit history also has limitations. Older records may not be digitized, and some documents may require a public records request or property-owner authorization.
A map can help you identify questions. It does not replace the agency's review or a professional's assessment.
3. Understand the Type of ADU You Are Considering
California recognizes several types of accessory dwelling units. The applicable requirements can depend on the proposed unit's location, size, relationship to the existing home, and how the space will be created.
Common project types include:
Detached ADU: A separate residential structure located on the same lot as the primary dwelling.
Attached ADU: A unit connected to the primary dwelling.
Conversion ADU: A unit created by converting existing space, such as a garage, basement, or other qualifying area.
Junior Accessory Dwelling Unit (JADU): A smaller unit created within an existing or proposed single-family residence, subject to separate statutory requirements.
ADU above a garage: A residential unit constructed above an existing or proposed garage.
The type of ADU can affect setbacks, fire separation, access, utility arrangements, parking, building-code requirements, and the documents needed for review.
Before selecting a plan, identify which category best describes the project and ask the applicable planning or building department how current state and local requirements apply.
4. Determine Whether the Property Can Accommodate the Proposed ADU
An ADU may be allowed under state law, but that does not mean every design will fit every property.
Start by reviewing the parcel's size, configuration, existing improvements, and available building area. Consider where the proposed unit could physically fit and whether the site has enough room for required access, utility connections, drainage, and construction activities.
Questions to investigate include:
Is the parcel eligible for the proposed ADU type?
Is there an existing primary residence?
Is the primary residence proposed for construction at the same time?
Is the property vacant?
Are there existing accessory structures?
Does the proposed location conflict with setbacks, easements, utilities, or access routes?
Is the parcel subject to a specific plan, overlay, or other local development standard?
Are there existing site conditions that could affect the proposed layout?
Do not assume that a vacant parcel can automatically accommodate an ADU as a standalone dwelling. State law and local processing rules distinguish between an ADU associated with a primary dwelling and certain circumstances involving concurrent construction or other qualifying arrangements. Generally, a California ADU cannot be built on a vacant lot by itself.
If the primary residence and ADU are planned together, ask the jurisdiction how the applications must be submitted and reviewed.
5. Research Existing Permits, Open Applications, and Code Enforcement Records
Before investing in new drawings, look into the property's existing permit history.
A property may have additions, garage conversions, electrical work, plumbing alterations, patio enclosures, or other improvements completed under prior ownership. Some work may have been permitted; other work may not appear in the agency's records.
Research:
Previous building permits and their final inspection status
Open or expired permit applications
Approved construction plans, if available
Existing code enforcement cases
Notices of violation or correction requirements
Unpermitted additions or conversions
Existing utility or site improvements that may not match approved plans
An open permit or unresolved code case does not automatically prevent an ADU application, but it may affect the review process or require additional attention. If there was any previous work that was unpermitted the AHJ may require that you to address it before proceeding with the ADU permit (or concurrently), which may include paying penalty fees, obtaining retroactive permits, and bringing the work up to current code through inspections and approvals.
Ask the applicable agency how to obtain historical permit records and whether the property has unresolved issues that could affect the proposed work.
Some agencies restrict access to certain documents or require property-owner authorization.
6. Identify Property Lines, Setbacks, Easements, and Existing Structures
A property's visible fence line is not necessarily the legal property boundary.
Before placing an ADU on a site plan, identify the parcel boundaries and investigate any recorded easements or restrictions that could affect construction.
Items to review include:
Front, side, and rear property lines
Required setbacks for the proposed ADU type
Public utility easements
Drainage easements
Access or private road easements
Existing buildings, garages, sheds, and retaining walls
Fences and walls near property boundaries
Existing driveways and paved areas
Overhead and underground utility corridors
A title report, recorded subdivision map, parcel map, or other recorded document may help identify easements and property restrictions. County Assessor maps are useful for preliminary research, but they should not be treated as a boundary survey.
If the exact location of a property line is important to the proposed design, consult a qualified licensed land surveyor.
An ADU layout that appears to fit on an aerial image may not work once actual property lines, setbacks, and easements are confirmed.
7. Review Zoning, Overlays, Historic Designations, and Private Restrictions
Zoning is an important part of early property research, but the zoning designation alone does not answer every question about an ADU.
Review the property's zoning and any additional designations that may affect development.
Depending on the location, these may include:
Zoning district and applicable development standards
Specific plan or master plan area
Historic district or historic landmark designation
Floodplain or special flood hazard overlay
Fire hazard or wildland-urban interface designation
Airport or other special-use overlay
Scenic corridor or design review area
Local tree protection requirements
Other property-specific planning restrictions
Homeowners Associations and Private Restrictions
If the property is part of a homeowners association (HOA), review the governing documents and ask whether there are applicable architectural or other private restrictions.
California law limits an HOA's ability to prohibit qualifying ADUs and JADUs, but certain reasonable restrictions may still apply. The details depend on the type of property and applicable law.
Do not assume that an HOA approval replaces a government permit, or that a government permit resolves every private-property restriction.
For legal interpretation of CC&Rs, easements, title matters, or disputes, consult a qualified attorney.
8. Investigate Fire Access, Hydrants, and Fire Protection Requirements
Fire access can be an important consideration, particularly for properties with narrow driveways, long access routes, limited street frontage, gates, or structures located far from a public road.
Depending on the property and the authority having jurisdiction, fire review may consider:
Fire apparatus access roads
Road and driveway width
Vertical clearance
Turning and turnaround areas
Gate access and emergency entry
Fire hydrant locations and water supply
Building access and address visibility
Fire sprinkler requirements
Fire separation and construction details
Wildland-urban interface requirements, where applicable
Do not assume every ADU requires a new fire access road, turnaround, hydrant, or sprinkler system. Requirements depend on the applicable code, local fire authority, site conditions, and proposed construction.
Identify the fire protection district or fire authority serving the parcel. The building department may coordinate fire review, or the applicant may need to obtain separate approval.
Fire Hazard Areas
Properties in designated fire hazard or wildland-urban interface areas may be subject to additional construction and site requirements.
Research the property's current fire hazard designation and ask the local fire authority whether the proposed ADU triggers additional requirements.
A property's location within a mapped fire hazard area should be verified using the current official map and the agency responsible for applying the requirements.
9. Check Flood Zones, Environmental Hazards, and Site Conditions
Flooding, soil conditions, and other environmental constraints can affect the design, foundation, grading, drainage, and overall cost of an ADU.
Research whether the property is located in or near:
A FEMA-mapped flood hazard area
A local floodplain or special flood hazard overlay
A levee or drainage facility influence area
A high groundwater area
A known landslide or slope hazard area
A designated environmental or conservation area
A location with known contamination or other site concerns
A map is a starting point, not a site-specific engineering determination. If a property is within a mapped hazard area, ask the jurisdiction what documentation or review is required.
Depending on the project, the agency may request an elevation certificate, geotechnical report, drainage analysis, floodplain documentation, or other technical information.
Do not assume that a property outside a mapped FEMA flood zone has no drainage or flood-related concerns.
10. Look for Protected Trees and Other Natural Resource Requirements
Trees can affect an ADU's location, construction access, grading, and foundation design.
Some jurisdictions regulate the removal, pruning, or encroachment into the protected area of certain trees. A tree may be protected based on its species, size, location, condition, or designation.
Before finalizing a site layout, identify:
Existing trees near the proposed ADU
Trees near proposed utility trenches
Trees that may be affected by grading or construction access
Protected or heritage trees
Tree preservation zones
Required arborist reports or tree permits
A tree that appears to be outside the proposed building footprint may still be affected by excavation, equipment access, material storage, or utility installation.
Contact the applicable planning or arborist department before removing or significantly altering a potentially protected tree.
11. Consider Soil, Geology, and Foundation Requirements
Not every ADU requires a geotechnical investigation. However, certain site conditions or structural designs may require additional information before the foundation can be approved.
Potential factors include:
Sloping or uneven ground
Fill soil or previously disturbed ground
Expansive or unstable soils
Retaining walls
Known geological hazards
Unusual foundation conditions
Structural design requirements
Local plan-review comments
A building department may request a soils or geotechnical report when the site or proposed design warrants it.
If a report is required, it should be prepared by an appropriately qualified professional. Do not rely on a neighboring property's report as proof that the same conditions exist on your parcel.
12. Evaluate Drainage, Grading, and Impervious Surfaces
An ADU changes how a property is used and may change how water moves across the site.
A new building, patio, walkway, driveway, or other hard surface can increase the amount of impervious area. The resulting drainage requirements depend on the jurisdiction, project scope, and existing site conditions.
Research:
Existing drainage patterns
Proposed roof runoff locations
Downspout discharge locations
Existing storm drains or drainage facilities
Surface flow toward neighboring properties
Proposed grading and finished floor elevations
New concrete, paving, and other impervious surfaces
Existing drainage easements
Required stormwater or onsite detention improvements
City of Sacramento Example
The City of Sacramento's ADU guidance identifies an onsite detention requirement when a project creates a net increase of more than 500 square feet of impervious area. This is a City-specific threshold and should not be applied automatically to properties under other jurisdictions.
Confirm the current calculation method and requirements with the applicable agency. A project may also have drainage obligations separate from this particular threshold.
Do not assume that directing roof runoff toward a neighboring property, public sidewalk, or existing drainage facility is acceptable.
13. Determine Whether the Property Uses Public Sewer or a Septic System
Utility service is one of the most important early considerations for an ADU.
First, determine whether the property is connected to public sewer or uses an onsite wastewater treatment system (OWTS), commonly referred to as a septic system.
If the Property Uses Public Sewer
Research:
Existing sewer connection location
Sewer lateral condition and capacity, where applicable
Proposed connection route
Required connection or capacity fees
Whether a separate connection is required
Whether the existing service can accommodate the proposed unit
Utility easements or access restrictions
The local wastewater agency may have separate requirements from the building department.
If the Property Uses a Septic System
Contact the agency responsible for onsite wastewater treatment systems before assuming the existing system can serve an additional dwelling unit.
Questions may include:
Is the existing septic system approved and in good standing?
Can the existing system serve the proposed ADU?
Is a system evaluation required?
Is a replacement or expansion necessary?
Is there adequate available area for the system and required reserve area?
Are soil evaluation, percolation testing, or other technical reports required?
Are there setbacks from wells, buildings, property lines, waterways, or other features?
Do not assume that every septic property requires a percolation test. The reviewing agency determines what information is necessary based on the existing system, site conditions, and proposed work.
For Sacramento County properties, begin with the Septic System Permit Process and Liquid Waste Program.
Other jurisdictions may have different environmental health agencies and procedures.
14. Identify Water, Electrical, Gas, and Other Utility Requirements
An ADU needs more than a building permit. Utility providers and other agencies may have their own application, design, inspection, and payment requirements.
Identify the providers serving the property and ask what is needed for the proposed unit.
Water
Research:
Existing water service location
Meter size and service capacity
Whether a separate meter is required or permitted
Proposed connection route
Backflow or other plumbing requirements
Water connection or capacity fees
Fire flow or water supply considerations, if applicable
Electrical
Determine which electrical utility serves the parcel and whether the proposed ADU will require a new service, meter, panel upgrade, or other electrical work.
In the Sacramento region, SMUD serves many properties, while PG&E serves other areas. Do not assume the provider based only on the mailing address.
Research:
Existing electrical service and panel capacity
Overhead and underground distribution lines
Existing utility easements
Proposed service route
Meter and service requirements
Transformer or other utility equipment locations
Required utility clearances
Whether a new service or upgrade is necessary
For SMUD service-area properties, contact SMUD directly about service planning and project requirements. Public maps can help with preliminary research, but they should not be treated as a substitute for utility confirmation or an approved service design.
For PG&E service-area properties, contact PG&E directly about their service planning and project requirements. Researching this early on in the project will save you on time and costs before moving on to the planning, construction and final inspection stages.
Gas
If natural gas is present, determine whether the ADU will use it or be designed as an all-electric unit.
The choice can affect utility coordination, mechanical plans, energy documentation, and electrical capacity.
Other Utilities
Depending on the property, additional coordination may involve telecommunications, cable or fiber providers, street lighting, utility districts, private water or wastewater providers, and irrigation or drainage districts.
Utility conflicts discovered after the site plan and construction drawings are complete can result in redesign, additional costs, or resubmittals. Investigate these items early.
15. Understand What Construction Drawings and Technical Documents May Be Needed
A building permit application generally requires construction documents that communicate the proposed work clearly enough for the agency to review it.
The required drawings and supporting documents depend on the scope, building type, site conditions, and local submittal requirements.
A typical ADU plan package may include:
Title sheet and project information
Detailed site plan
Floor plan and dimensions
Roof plan
Exterior elevations
Building sections and construction details
Foundation plan
Framing plans and structural details
Electrical plan
Mechanical plan
Plumbing plan
Energy compliance documentation
CalGreen documentation, where applicable
Structural calculations, when required
Truss calculations and layout, when applicable
Soils or geotechnical reports, when required
Erosion control plan, when required
Solar (PV) plans and supplemental documents, when required
Fire sprinkler plans and documentation, when required
Supporting agency approvals and supplemental documents and forms
A plan set should reflect the actual property conditions and the proposed construction—not simply a generic floor plan placed on a parcel map.
The information listed above is based on what I have seen from personal experience and may not reflect most or all ADU projects. Check with your local AHJ to determine all of the required documentation for your unique project scope and needs.
Site Plan Considerations
The site plan is especially important because it connects the proposed building to the property.
It may need to identify:
Property boundaries and dimensions
Existing and proposed structures
Setbacks
Easements
Driveways and access routes
Utility locations and proposed connections (sometimes listing existing and proposed capacities or connection sizing/dimensions, when required)
Trees and other site features
Existing and proposed grading
Drainage information
North arrow and scale
Building dimensions and distances to property lines
The exact information required depends on the agency's current submittal checklist.
Roof Framing: Trusses Versus Conventional Framing
A proposed roof design can affect structural documentation.
Conventional stick-framing and prefabricated roof trusses are not interchangeable without appropriate design and documentation. If a project changes from the framing method shown on the approved drawings, revised plans and structural documentation may be necessary.
For example, a truss package may require engineered truss calculations, a dimensioned truss layout, and supporting structural details.
Discuss the intended framing system with the design professional before the plans are finalized.
Work With Qualified Professionals
Depending on the scope, the project may require an architect, engineer, land surveyor, geotechnical professional, energy consultant, or other appropriately licensed or qualified professional.
Permit coordination is not a substitute for professional design or technical services.
16. Review the Current California Building and Energy Code Requirements
California's building standards are updated on a regular cycle. The applicable code requirements generally depend on the date and status of the permit application, along with any applicable transition provisions.
The 2025 California Building Standards Code took effect January 1, 2026. Projects submitted under the new code cycle may be subject to updated requirements for building, residential, electrical, mechanical, plumbing, fire, energy, and green building standards.
For an ADU, applicable requirements may include:
California Residential Code or applicable building code provisions
California Electrical Code
California Mechanical Code
California Plumbing Code
California Fire Code
California Energy Code
California Green Building Standards Code (CalGreen)
Local amendments and applicable agency standards
Energy and Electric-Ready Requirements
Do not assume every ADU must be all-electric, or that every project can use gas appliances without additional requirements.
The applicable energy standards can depend on the project type, equipment selected, and requirements in effect when the application is submitted.
If gas or propane equipment is proposed, electric-ready provisions may apply to certain equipment or building configurations. Energy compliance documentation should be prepared by someone familiar with the current code and proposed design.
Useful state resources include the California Energy Commission's 2025 Energy Code information and its Energy Code Support Center.
Personally, I like to utilize Energy Code Ace as a supplement, for research and training purposes to understand energy code requirements.
Confirm applicable requirements with the design professional and permitting agency.
17. Check Addressing, Alley Access, and Emergency Identification
In most cases, a new ADU will require a separate address or other addressing approval.
This is particularly important for properties with alley access, multiple dwellings, long driveways, or more than one building entrance.
Ask the jurisdiction whether the proposed unit requires:
A separate street address
Address assignment or approval
Address signage
Alley or street identification signage
Emergency access identification
Specific placement or visibility requirements
For example, the City of Sacramento's ADU Resource Center addresses separate addressing and other project considerations.
Do not wait until construction is nearly complete to determine whether addressing requirements affect the site layout or access.
18. Determine Whether Encroachment, Traffic Control, or Grading Permits May Be Needed
Some ADU projects extend beyond the building footprint and involve work in or near the public right-of-way.
Depending on the location and scope, separate approvals may be required for:
Sidewalk or curb work
Driveway approach modifications
Street or alley work
Utility trenching
Temporary construction access
Street or sidewalk closures
Crane or equipment placement
Traffic control
Work affecting public improvements
Grading or excavation
A building permit does not automatically authorize work in a public street, sidewalk, or other public right-of-way.
Ask the applicable public works or engineering department whether separate encroachment, transportation, grading, or traffic-control approvals are required.
Requirements vary by jurisdiction. Do not assume that a rule used by one city applies to another.
19. Research Demolition and Construction Waste Requirements
If an existing garage, accessory structure, or other improvement must be removed to accommodate the ADU, determine whether a separate demolition or wrecking permit is required.
Also investigate the jurisdiction's construction and demolition (C&D) waste requirements.
Depending on the project and local rules, the applicant may need to:
Obtain a demolition or wrecking permit
Submit a waste management plan
Use an approved recycling or waste tracking program
Document material diversion
Submit final waste documentation
Coordinate removal of utility services before demolition
Some jurisdictions use online waste management systems to track construction debris and recycling.
For City of Sacramento projects, start with the City's Construction and Demolition Recycling resources.
Sacramento County has a separate Construction and Demolition Debris program.
Confirm current requirements with the agency responsible for the property and the scope of demolition.
20. Understand Special Considerations for Fire-Damaged or Rebuild Projects
An ADU proposed after a fire or other disaster may involve additional issues beyond a typical new-construction application.
Before preparing plans, determine:
Whether the existing primary residence is still legally habitable
Whether demolition or removal permits are required
Whether the property has unresolved code or safety issues
Whether utilities have been disconnected or damaged
Whether the proposed work is a repair, reconstruction, replacement, or new ADU
Whether special disaster-recovery provisions apply
Whether the property is subject to current flood, fire, or other hazard requirements
Do not assume that a special rebuilding provision applies to every fire-damaged property or every ADU. Some statutory protections are limited by property type, prior legal status, project scope, or other conditions.
Ask the permitting agency which rules apply to the specific property and proposed work. Consult an attorney or qualified design professional when the project involves legal rights, reconstruction eligibility, or complex property issues.
21. Consider Rental Use, Occupancy, and Future Property Operations
If the ADU may be rented, used by family members, or occupied separately from the primary residence, research the applicable occupancy and rental rules before making assumptions about future use.
Questions may include:
Are there local rental registration or business requirements?
Are there restrictions on short-term rentals?
Are there applicable tenant protection or landlord-tenant requirements?
Are separate utility meters or services permitted?
Are there rules governing owner occupancy for the proposed unit type?
Are there restrictions on separate sale or conveyance?
Are there insurance or financing considerations?
California law generally treats ADUs and JADUs differently for certain owner-occupancy and rental requirements. The rules can change, and local requirements may depend on the unit type and applicable law.
Do not rely on informal advice or a neighbor's experience. Review current state law and local requirements, and consult a qualified attorney for legal questions.
22. Identify the Other Professionals and Agencies That May Be Involved
A homeowner may work with several professionals and agencies throughout the ADU process.
Depending on the property and project, the team may include:
Architect or residential designer
Structural engineer
Civil engineer
Land surveyor
Geotechnical engineer
Energy consultant
General contractor
Licensed trade contractors
Fire protection district
Water and wastewater providers
Electrical utility service
Environmental health department
Public works or engineering department
School district
Local building and planning departments
Not every project needs every professional or agency listed above.
The goal is to identify the parties that may need to review, approve, provide information for, or perform work related to the proposed ADU.
It is also helpful to establish who is responsible for preparing drawings, responding to technical plan-check comments, coordinating utility applications, submitting permit documents, and communicating with each agency.
Clear responsibilities can prevent missed steps and duplicated work.
23. Build a Realistic Budget: Fees and Costs Homeowners May Overlook
The construction estimate is only one part of an ADU budget.
Before committing to a design, consider the costs associated with research, professional services, agency review, utility work, and site preparation.
Potential expenses may include:
Surveying and property research
Architectural or drafting services
Structural engineering
Civil engineering or drainage design
Geotechnical reports
Energy compliance documentation
Tree reports or permits
Septic evaluations or system improvements
Utility service upgrades
Sewer or water connection charges
Electrical service upgrades
Fire sprinkler or fire access improvements, if required
Demolition and disposal
Grading and drainage work
Plan review and building permit fees
Planning or other agency fees
School district developer fees, if applicable
Public works or encroachment permits
Construction waste management
Inspections and testing
Revisions and resubmittals
School District Impact Fees: A Separate Item to Investigate
School district fees deserve separate attention because they are not the same as general local development impact fees.
Under California Education Code section 17620, school districts may impose developer fees on certain residential construction. State law includes a specific ADU provision tied to interior livable space: ADUs larger than 500 square feet may be subject to school district fees. The district must be consulted to determine whether it imposes a fee and how it applies the exemption and area calculation.
Important distinctions:
An ADU of 500 square feet or less is generally outside the school-fee threshold under this provision.
An ADU larger than 500 square feet may be subject to a school district fee.
The district may have its own current fee schedule and administrative process.
Some districts may have exemptions or policies that are more generous than the baseline state rule.
School district fees are separate from other local development impact fees.
For example, a 600-square-foot ADU may be exempt from certain general development impact fees under the separate 750-square-foot rule described below, while still potentially being subject to a school district fee. The two thresholds should not be confused.
How to Identify the School District
A property can fall within more than one school district boundary, such as an elementary school district and a high school district. The district is determined by the property's location—not simply the mailing address or the school a child currently attends.
For preliminary research, use the Sacramento Local Agency Formation Commission mapping resources and the California Department of Education School Directory.
The California Department of Education explains that it does not maintain a definitive statewide school district boundary map for property fee determinations. See its school district boundary information.
Use mapping tools as a starting point, then confirm the applicable district or districts directly.
Ask each district:
Does the district collect developer fees for ADUs?
What is the current residential fee rate and effective date?
How does the district calculate the assessable area?
Does the district have an ADU exemption that differs from the general state threshold?
Does the district require an application or exemption form even when no fee is due?
What documents must be submitted?
Is proof of payment or exemption required before the building permit can be issued?
Are separate elementary and high school district fees collected?
For City of Sacramento projects, the City's School District Impact Fee form is a useful reference. It identifies school districts and provides contact information. Confirm current rates and requirements with the district before relying on the form.
For Sacramento County projects, review the School District Fees Certification of Compliance form.
The Elk Grove Unified School District Facilities and Planning Department is an example of a district with its own published fee information and ADU-related guidance.
Do not assume the same fee rate or exemption applies to every district in the region.
Other Development Impact Fees
California law provides a separate impact-fee exemption for qualifying ADUs of 750 square feet or less. ADUs above that size may be subject to proportionate impact fees under the applicable state rules.
This is not a blanket waiver of every project cost.
Even when an ADU qualifies for the general impact-fee exemption, other charges may still apply, including building permit fees, plan review fees, inspection fees, utility connection or capacity charges, and other fees that are not covered by that exemption.
Some fees depend on the jurisdiction, project location, size, type, or utility provider.
For City of Sacramento projects, review the City's ADU Fee Estimate Form, Building Fees by Project, and Department of Utilities Development Impact Fees.
For other jurisdictions, request a project-specific estimate from the applicable building department and utility providers.
Budgeting reminder: A fee estimate is not necessarily a final invoice. Rates can change, and the final amount may depend on submitted plans, agency review, and project details.
24. Understand the Overall Permit and Construction Timeline
An ADU project involves more than the time required for building department plan review.
The overall timeline may include:
Property research and feasibility review
Surveying and site information collection
Utility and outside-agency inquiries
Design and construction document preparation
Initial application and document submittal
Application completeness review
Plan review by the building department and other agencies
Correction comments and revised plan submittals
Payment of applicable fees
Permit issuance
Construction
Required inspections
Final inspection and closeout for occupancy
Some activities can occur concurrently, while others depend on earlier approvals.
The time required can be affected by the complexity of the site, completeness of the initial application, outside-agency review, design revisions, staffing levels, and the applicant's response time.
Published review timelines are estimates, not guarantees. Ask the applicable jurisdiction how its current review process works and whether other approvals must be completed before the building permit can be issued.
PART 2: HOMEOWNER PREPARATION
25. Homeowner ADU Research Checklist
Before contacting a design professional or submitting an ADU application, gather as much of the following information as is reasonably available.
Property and Jurisdiction
Have the title or deed readily available, listing any applicable easement information.
Confirm the property's actual permitting jurisdiction.
Record the property address and Assessor's Parcel Number (APN).
Identify the zoning designation.
Check for overlays, historic designations, and special plan areas.
Identify the fire protection district or authority.
Identify the applicable school district or districts.
Confirm which agencies have authority over the parcel.
Existing Property Conditions
Locate available property maps and recorded documents.
Identify existing buildings and accessory structures.
Research existing permit history.
Check for open permits or code enforcement cases.
Identify known unpermitted work.
Locate easements and other recorded restrictions.
Identify existing trees and potential tree protections.
Review drainage patterns and site conditions.
Proposed ADU
Identify the proposed ADU type.
Establish an approximate size and layout.
Identify a potential building location.
Consider setbacks and access.
Determine whether the primary residence is existing, proposed, or vacant.
Consider whether demolition or conversion work is involved.
Identify potential fire access and addressing issues.
Utilities and Outside Agencies
Identify the water provider.
Determine whether the property uses public sewer or septic.
Identify the electrical utility.
Research electrical service capacity and utility locations.
Identify gas service, if applicable.
Ask about utility connection and upgrade requirements.
Identify other agencies that may need to review the project.
Contact the school district or districts about applicable fees and forms.
Documents, Costs, and Scheduling
Gather available surveys, site plans, and existing construction plans.
Identify which design and engineering professionals may be needed.
Review the jurisdiction's current ADU submittal checklist.
Request preliminary fee information.
Account for school district and utility fees.
Consider demolition, drainage, grading, and construction waste costs.
Establish a preliminary project schedule or timeline.
Confirm who will prepare plans, submit applications, and respond to plan-check comments.
Determine who will be responsible for construction activities.
You do not need to have every answer before beginning. The purpose of this checklist is to identify important questions early enough that they can be investigated before they become expensive surprises.
26. Questions Homeowners Should Ask Before Moving Forward
When contacting the building department, planning division, utility provider, fire authority, school district, or another agency, be prepared to explain the property and proposed project.
Useful questions include:
Does your agency have jurisdiction over this parcel?
What is the property's current zoning designation?
Are there any overlays, special planning areas, or additional development standards?
Which ADU type and approval process would apply?
Is there a current ADU handout, checklist, or application form?
Are there site conditions that require additional review?
Which outside agencies must review or approve the project?
Are utility connection, service upgrade, or capacity requirements anticipated?
Are separate permits required for demolition, grading, encroachment, or other work?
Are school district fees or other impact fees applicable?
What documents must be submitted before the application can be considered complete?
How are plan-check comments and revised documents submitted?
What is the current inspection scheduling process?
What must be completed before final approval or occupancy?
Whenever possible, retain written responses, reference numbers, emails, and copies of documents. A phone conversation can be helpful, but it should not be treated as a formal approval or binding determination unless the agency specifically provides one.
PART 3: ADDITIONAL RESOURCES AND NEXT STEPS
27. Statewide ADU and Building Code Resources
In addition to local agency resources, homeowners may find the following state references useful:
The California Department of Housing and Community Development ADU Handbook provides statewide ADU guidance and explains applicable state law.
California Legislative Information provides access to current state statutes, including Government Code ADU provisions and Education Code section 17620 concerning school district developer fees.
The California Department of Education School Directory can help identify school districts and contact information.
The California Energy Commission provides current energy code information and compliance resources.
State law establishes many ADU protections and requirements, but local agencies still administer building permits, site-specific reviews, inspections, and applicable local procedures.
28. How EZPZ Permits Can Assist
Researching a property and identifying the agencies involved can take time, especially when a project requires coordination beyond the local building department.
EZPZ Permits, LLC provides permit-related administrative and coordination services for residential and commercial projects in the Sacramento region.
Depending on the project scope and the client's needs, services may include:
Site Analysis
Preliminary on-site and web-based research to help identify property conditions, jurisdictional considerations, and potential agency requirements that may affect the permitting process.
Permit Expediting
Administrative coordination of permit applications, documents, agency communications, correction responses, and submittal-related follow-up.
Project Management
Coordination of permitting activities and administrative tasks to help keep the permit process organized and aligned with the client's project needs. This service is limited to the permitting and administrative side of the project, not construction management.
Inspection Coordination
Administrative coordination of required inspections with the applicable permitting agency and outside agencies, as needed.
The appropriate scope depends on the property, project type, and services requested. A preliminary discussion can help identify the information available and determine what additional research or professional services may be necessary.
To learn more, contact info@ezpzpermits.net.
Important Homeowner Responsibilities and Disclaimer
This article is provided for general informational and educational purposes only. It is intended to help property owners identify topics, agencies, and resources to research when considering an accessory dwelling unit.
The homeowner is responsible for conducting independent research and verifying all requirements applicable to their specific property and project. Reading this guide, using its links, consulting an online map, or contacting EZPZ Permits does not replace the homeowner's responsibility to identify and communicate with the appropriate agencies, utility providers, school districts, fire authorities, licensed professionals, contractors, and other parties involved in the proposed work.
Property owners should independently:
Confirm the property's jurisdiction and the agencies with authority over the parcel.
Verify current zoning, land-use restrictions, ADU eligibility, and applicable local ordinances.
Obtain and review relevant property records, maps, title documents, easements, and existing permit information.
Contact each applicable agency and outside service provider to determine current requirements, approvals, fees, and procedures.
Retain appropriately licensed or qualified professionals for architectural, engineering, surveying, geotechnical, energy, legal, environmental, construction, and other professional services when required.
Confirm that all plans, reports, calculations, applications, and supporting documents are accurate and complete with the appropriate licensed professionals.
Obtain all required approvals and permits before beginning regulated work.
Ensure construction is performed by appropriately qualified or licensed contractors and that required inspections are scheduled and completed.
Confirm final inspection, permit closeout, and occupancy requirements directly with the responsible agency.
No Guarantee of Approval, Cost, or Timeline
The information and examples in this guide do not establish that a particular property is eligible for an ADU or that a proposed design will be approved.
Laws, codes, agency policies, fee schedules, maps, application procedures, and contact information may change. Requirements vary by jurisdiction and individual property. The examples and links in this article are starting points and may not apply to every project.
Agency decisions, plan approvals, permit issuance, utility approvals, inspection results, construction costs, and project timelines are determined by the applicable agencies, service providers, contractors, and qualified professionals. No approval, outcome, cost, or timeline is guaranteed.
Maps, Online Resources, and Third-Party Information
Online maps, parcel records, zoning tools, GIS layers, permit databases, and other public resources may contain errors, omissions, outdated information, or generalized data. They should not be relied upon as a substitute for official agency confirmation, recorded documents, site investigations, or professional determinations.
Links are provided as a convenience. EZPZ Permits, LLC does not control third-party websites and cannot guarantee that their content, availability, accuracy, or links will remain unchanged.
EZPZ Permits Service Limitations
EZPZ Permits, LLC provides permit-related administrative and coordination services only. Unless separately arranged and performed by appropriately qualified or licensed professionals, EZPZ Permits does not provide architectural, engineering, land surveying, legal, environmental, construction, or other licensed professional services.
Permit coordination does not replace the homeowner's responsibility to retain qualified professionals, obtain required approvals, comply with agency requirements, or ensure that construction is properly performed.
Any representation before a permitting agency is subject to the client's written authorization and the applicable agency's rules and requirements for agents or representatives.
Nothing in this article creates an agency relationship, authorization to represent a property owner, or an agreement to perform services.
Limitation of Reliance
This guide is not a property-specific feasibility determination, zoning verification, legal opinion, architectural or engineering assessment, land survey, environmental evaluation, utility approval, permit application, or guarantee of approval.
Property owners should not make financial, design, construction, or legal decisions solely in reliance on this general information. To the fullest extent permitted by applicable law, EZPZ Permits, LLC disclaims liability for decisions made solely in reliance on this article. Nothing in this disclaimer is intended to exclude liability that cannot legally be excluded.
Start with the property. Then build the plan.